-
李蓓智
- 东华大学机械工程学院纺织装备教育部工程研究中心
| 东华大学化学与化工学院纺织面料技术教育部重点实验室
| College of Mechanical Engineering , Donghua University, Shanghai 200051roduction scheduling is one of the most important problems to be considered in the effective performance of the automatic manufacturing system. It is the typical kind of NP-complete problem. The methods commonly used are not suitable to solve complicated problems because the calculating time rises exponentially with the increase of the problem size. In this paper, a new algorithm- immune based scheduling algorithm (IBSA) is proposed. After the description of the mathematics model and the calculating procedure of immune based scheduling, some examples are tested in the software system called HM _ IM& C that is developed using VC+ +6.0. The testing results show that IBSA has high efficiency to solve scheduling problem.
... 更多
- 学者ID:3292814954
对比
关注
-
发文成果统计
-
发文趋势
-
研究领域
-
优质成果收录
-
研究主题图谱
-
主要发文期刊
-
基金成果趋势
发文成果统计
发文趋势
暂无数据
研究领域
暂无数据
优质成果收录
暂无数据
研究主题图谱
暂无数据
主要发文期刊
暂无数据
基金成果趋势
暂无数据
关系合作图谱
合作作者图谱
暂无数据
合作机构图谱
暂无数据